Skip to main content

About your Search

20121001
20121009
STATION
SFGTV2 2
LANGUAGE
Search Results 0 to 1 of about 2 (some duplicates have been removed)
will make the environment better. we had approximately 1,000 overflows occur in 1999. today, we've reduced overflows by 45% to 50%. and it's going to continue to improve as we go forward with the rehabilitation program that's required under the consent decree. narrator: an important piece of the program is the construction of an 8-mile-long storage tank that will significantly decrease combined sewer overflows. man: right now, we're at the bottom of the rockdale construction shaft. we're 310 feet below grade, deep under atlanta in hard rock. in the downtown area of atlanta, the sewer system and the stormwater system are combined and there are overflows during storm events, and so the purpose of this system is to relieve that flow, take it into the tunnel, transport it to a brand-new treatment plant, clean up the chattahoochee river. narrator: instead of the combined sewage overflowing into the river, it will flow into this tunnel that acts as a storage tank. the water will then slowly empty into the new plant for treatment before it's released back into the river. man: the system in total
Search Results 0 to 1 of about 2 (some duplicates have been removed)